News

Author: Cezary Wenda | Publish date: 21 September 2017

Repair of the surface of the roadway and sidewalks. The exhibition

21 September 2017, Author: Cezary Wenda

Soon will begin repair of the surface of the roadway and sidewalks on going to the market. The exhibition in Elk. The total value of the investment is 180 thousand. zł.

Completed tender procedures and will soon be signed the contract with the contractor for the renovation of the surface of the roadway and sidewalks on going to the market. The exhibition in Elk.

Within the framework of the tasks will be completed the following works, such as:

·  demolition of concrete curb, and concrete edging

·  demolition of the surface of the road of trylinki, concrete block and road plates

·  demolition of the paving sidewalks with concrete slabs

·  setting the kerbs concrete-450 m

·  execution of the surface of the roadway with concrete block-980 m2

·  execution of the surface of the roadway with concrete block (color)-470 m2

·  execution of the surface of the roadway from trylinki-500 m2

·  the execution of paving sidewalks with concrete block-450 m2

·  adjustment of the sewage wells, drains, water and gas valves

Executor elected tender is a company Przedsiębiorstwo Produkcyjno-"EŁMEX" SP. z o.o. in Elk. The total value of the investment is 180,416.40 €.

Expected date of completion of the investment is 60 days from the date of signature of the agreement.

Calendar