New light on Kosciuszko Street in Elk
21 December 2017, Author: Cezary Wenda
Has been completed and accepted urban investment at ul. Kosciuszko in Elk. As part of the work has been rebuilt street lighting and have been mounted poles with a LED, the section from the junction with ul. Polish troops to enter the University of Warmia and Mazury in Elk.
The work consisted of m.in. on: the dismantling of an existing line, the construction of a new line of lighting installation lighting poles with a LED, the land along with the playing surface paved and green. In addition, the contract with the contractor includes the servicing of installed devices during the warranty period (10 years).
The contractor was the company SETUP Władysław Bałdyga in Elk.
The total value of the investment is 338 250 zł.
The next planned investments on upgrading lighting in Elk in 2018, is m.in:
· UL. Industries-Suwalki-replacing sodium luminaires to LED fixtures
· UL. Army-the exchange of sodium luminaires to LED fixtures, construction poles and luminaires
· UL. Sikorski from ul. Polish troops to the railway crossing-Exchange columns and sodium luminaires to LED fixtures
· Municipal beach Lambs building cable power lines, poles and LED luminaires (40W)
· UL. Suwalska, from the PRIM-u to meat plants-construction of cable lines, poles and LED luminaires
· Copernicus Park III stage-construction of cable lines, poles and LED luminaires
· backyard. Army, from # 38 to # 58-construction of cable lines, poles and LED luminaires
· backyard. Gdańsk, 30 to 38 and ul. Gizewiusza 1-construction of cable lines, poles and LED luminaires
· backyard. Kochanowski 64A-construction of cable lines, poles and LED luminaires
· backyard. The Slovak 22A and ul. Kościuszki 1 to 3-construction of cable lines, poles and LED luminaires
· backyard. Wawel 2-construction of cable lines, poles and LED luminaires
· backyard. Polish Army 14, 16 and 18-construction of cable lines, poles and LED luminaires
· backyard. Polish Army 7 and 9-construction of cable lines, poles and LED luminaires
· backyard. Świackiego Vulture 1 and ul. Moniuszki 17, 19-construction of cable lines, poles and LED luminaires
· backyard. Orzeszkowej 15, 17, 19 and 21-construction of cable lines, poles and LED luminaires
· Park on the estate Kayki, ul. Milosz-construction of cable lines, poles and LED luminaires
· Park on the estate Kayki, between ul. Circumferential Highway and ul. Julian tuwim-construction of cable lines, poles and LED luminaires
· Park on the estate Bogdanowicza. -Construction of cable lines, poles and LED luminaires
· Park in Grunwald, at ul. Dukes of Masovia-construction of cable lines
- News (3133) »
- Events happening in Ełk (1205) »
- Education (384) »
- Videos from the series Safe Elk (9) »
- Videos of the series happens in ełk (29) »
- Physical Culture Development Fund (1) »
- Investments (186) »
- Invest - aktualności (115) »
- Invest - projekty inwestycyjne (24) »
- Invest - tereny inwestycyjne (2) »
- About Coronavirus (97) »
- Culture (510) »
- In memory (9) »
- White Lily Award Winners (12) »
- NATO in Masuria (11) »
- Awards and distinctions for Ełk (25) »
- Awards and scholarships (34) »
- Deliberations of the Elk City Council (38) »
- Ngos (305) »
- Aid to Ukraine (54) »
- Improving the energy efficiency of buildings (1) »
- Clean Air Priority Programme (2) »
- Government Local Government Roads Fund (6) »
- Government Local Investment Fund (10) »
- Government Program for the Reconstruction of Monuments (2) »
- Revitalization (51) »
- Entertainment (670) »
- Anniversaries and celebrations (140) »
- Sport (347) »
- Obstructification and changes in traffic organisation (62) »
- Obstructification and change of traffic organisation (62) »
- International cooperation (16) »
- Adopt an Ełk dog (4) »
- Tasks carried out from the state budget or from state special purpose funds (1) »
- Green transport (2) »